December 2002
Job:
A
recent break in
a San Antonio
sewer line
required the
repair of
24-
and 42- inch
pipes that
collapsed due to
soil erosion.
Godwin Pumps was
called on
an
emergency basis
to assist
with
the major line
break.
Working
around the
clock,
Godwin
set up the
necessary
bypass
system, so that
repairs
could
commence as soon
as
possible. A
section of the
bypass included
the suspension
of a discharge
line over the
creek. Nearly a
mile of
discharge line
was completed
in less than 17 hours. Two
Godwin CD225 8-inch Dri-Prime
pumps and 4,900 feet of pipe
handled flows up to 2 mgd.